Project Description
Red Rehau Hydronic pex a piping with 200mm centres prior to concrete pour. Standard procedure is to have the builder mark out the kitchen bench and cupboards, in this case with yellow paint, so that we avoid those areas to stop the pipe from being ruptured during cabinet installation. All in slab installations have a pressure gauge to ensure no pressure is maintained during the concrete pour and then once enclosed inside the slab the pipe is very secure.